Blog

Progress on Project ‘LNG Prototype Pack’

VICUSdt has been working on this project all along this year, collaborating in the design of the prototype of an LNG membrane tank that will be soon constructed and tested.

FEM structural analysis was carried out in order to determine the validity of the dimensioning and design of this prototype, under extreme temperatures, high pressures, and variable loads.

In parallel, acceleration linked to shipping movements due to waves, and sloshing caused in these situations, are also calculated in this project.

Besides VICUSdt, Gabadi – leader of the consortium-, NEO-CH4 Galicia and Inova Labs, have joined forces in this project.

Logos LNG Pack Project Consortium
LNG Prototype Pack initiative is funded by the Axencia Galega de Innovación (GAIN) through the Conecta Pyme program, with funds from Feder and the Ministry of Industry.

LNG
SubvencionLNGPack

Privacy Overview

This website uses cookies so that we can provide you with the best user experience possible. Cookie information is stored in your browser and performs functions such as recognising you when you return to our website and helping our team to understand which sections of the website you find most interesting and useful.

Strictly Necessary Cookies

Strictly Necessary Cookie should be enabled at all times so that we can save your preferences for cookie settings.

Cookies de terceros

Esta web utiliza Google Analytics para recopilar información anónima tal como el número de visitantes del sitio, o las páginas más populares.

Dejar esta cookie activa nos permite mejorar nuestra web.